SAFE & SCALABLE INSTALLATION OF LINE HARDWARE
Infravision is installing line hardware on overhead earth wires and conductors using unmanned aircraft. This allows our customers to significantly reduce risk and costs by up to 67%.
Book a demonstration today.
CURRENT CAPABILITIES
Installation of Bird Diverters/Flappers
- The PLP Raptor Payload enables the unmanned aircraft to remotely install Raptor Bird Diverter Clamps utilising an onboard targeting system and flight path cueing to accurately apply the clamps.
In development:
- Marker ball installations
- Spacers installation
- Vibration dampeners installation
- General line hardware
- Site construction services by unmanned aircraft

CURRENT CAPABILITIES
Installation of Bird Diverters/Flappers
- The PLP Raptor Payload enables the unmanned aircraft to remotely install Raptor Bird Diverter Clamps utilising an onboard targeting system and flight path cueing to accurately apply the clamps.
Coming soon…
- Marker ball installations
- Spacers installation
- Vibration dampeners installation
- General line hardware
- Site construction services by unmanned aircraft


UP TO 120 INSTALLED
PER DAY
Payload, onboard targeting system and flight path cueing to accurately apply the clamps.

REDUCE OPERATIONAL
RISK
Eliminate working from heights risk associated with traditional methods.

67% COST
REDUCTION
Increase in operational efficiency means Infravision delivers material cost savings.
PROJECT | COMPLETION DATE | OUTPUT |
---|---|---|
330kV Industry Demonstration | June 2019 | Stringing |
Snowy Mountains 330kV Bushfire Repairs | March 2020 | Stringing |
Fibre Optic New Construction | April 2020 | Stringing |
Bird Diverter Installation Trial | May 2020 | Line Hardware Install |
132kV Wind Farm Connection New Construction | July 2020 | Stringing |
330kV Bird Diverter Installation | October 2020 | Line Hardware Install |
Snowy Mountains 330kV Refurbishment | November 2020 | Stringing |
Storm Damage 132kV – Inspection | December 2020 | Asset Inspection |
132kV New Construction | February 2021 | Stringing |
132kV Overhead Earth Wire Repairs (Live Line) | April 2021 | Stringing + Disentanglement |
Distro Emergency Repairs (1.5km / 4660ft span) | June 2021 | Stringing |